Detector's status: CVS HEAD 08/02/2006

 

ITS

TPC

TRD

TOF

RICH

PHOS

EMCAL

FMD

PMD

START

VZERO

MUON

ZDC

CRT

Geom.

84 overlaps >0.1,
new with TGeo?

OK

OK

4 overlaps >0.1

OK

OK

OK
(shashlyk)

OK

OK

6 overlaps >0.1

OK (v6)

38 overlaps>0.1

OK

OK

Mat.

fract. Z

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

Hits

OK

Fluka?

Fluka?

OK

OK

OK

OK

Too long
E-tail?

OK

OK

OK

OK

OK

OK

RAW

OK

OK

OK

OK

OK

Test<->Raw

No rec.

OK

OK

OK

OK

OK

OK

-

Trigger

first classes

-

Standalone

-

-

first classes

No?

-

-

same as rec.?

same as rec.?

OK

No?

No?

SDigits

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

-

Digits

OK

OK

OK

OK

OK

OK

OK

OK

 

OK

OK

OK

OK

-

Rec. points

clusters V2
vs rec. points

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

-

Final rec.

check tracker SA

OK

OK

OK

OK

OK

OK?

OK

OK

OK

OK

OK

OK

-

PID

OK

OK

OK

OK

OK

OK

OK?

-

OK

-

-

OK

-

-

ESD

OK

OK

OK

OK

OK?

OK

OK?

-

OK

OK

-

OK

OK

-

Alignment

first prototype within the common framework + TPC example

No

No

No

No

No

No

No

first classes

No

No

Calibration

SPD + new
classes (SDD,SSD)

No

first classes

No

No

first classes

No

No

No

No

first classes

first classes

OK

No

IO

OK

OK

OK

OK

OK

Getter

Getter

OK

OK

OK

OK

OK

OK

OK

Libs

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

OK

no split

Doc

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Coding

 

 

 

 

 

 

 

 

 

 

 

 

 

 


Alignment requirements:

  1. Alignment framework -> in progress

ESD requirements:

  1. Meaningful run and event number (PDC productions) -> in progress (to be released 02/06)
  2. Information about Root and AliRoot versions -> in progress (to be released 02/06)
  3. Error matrix for the impact parameters
  4. Storage of track parameters in AliExternalTrackParameter -> done 07/02
  5. Additional data for multiplicity analysis (tracklets, ITS clusters, V0, FMD, etc.)  -> first prototype

Reconstruction requirements:

  1. Access to the reconstruction criteria (tracks, kinks, vertexes, cascades, etc.)
  2. Procedure for the tuning of the reconstruction criteria
  3. Optimization and improvement of the primary vertex finder/fitter based on tracks (proton-proton events)
  4. Event loop outside the local reconstruction
  5. Optimization of the speed and memory consumption -> in progress
  6. Estimation of the alignment and calibration influence <- new

PID requirements:

  1. Realistic detector response functions
  2. Treatment of the mismatching
  3. Estimation of the alignment and calibration influence <- new

IO requirements:

  1. Simplification of the IO scheme
  2. Easy access to the kinematics, event headers, etc. for several file sets

Simulation:

  1. Trigger simulation -> first prototype in CVS 20/01/06
  2. Interface of MC@NLO -> in progress

Analysis:

  1. AOD development and validation
  2. Incorporation of the existing analysis code to the CVS repository
  3. Analysis demo for the Super Computing 2005 conference -> done 15/11/05

Visualization:

  1. New event display (GLED->Root) -> first prototype
  2. Visualization of the analysis objects

Documentation:

  1. AliRoot manual -> in progress (the first draft to be released 02/06)